What to know about McQuay chillers
For an older McQuay-labeled chiller, legible original tags and subsequent retrofit records are particularly useful. A maintenance document may use a different company name from the badge on the machine, so provide both when available without assuming the model or refrigerant has stayed unchanged.
A surplus machine may have become available because of a replacement, closure or consolidation. Tell us whether it is a complete chiller, what remains attached and who can authorize its sale. No assumption about its age or condition is necessary.
Plan the pickup at your Ohio site
Ohio pickup planning starts at the exact equipment location, not just the mailing address. Show the machine in its room or on its pad, the intended exit, the route to a truck and any locked gates. Tell us who can approve access and whether nearby equipment needs to stay in service. A roof, basement and outdoor yard each present different handling questions.
Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.
Work with an incomplete equipment record
Send close photos of original and updated labels, the complete unit and any replacement control or starter cabinet. Note the rated capacity as stated, if known.
If the tag is difficult to read or the machine is no longer powered, a wide photo and an existing asset list can still start the conversation. Do not climb, remove electrical covers or enter an unsafe area to obtain a picture. Send whatever model, serial, capacity, voltage and refrigerant information is safely available, and clearly mark unknown fields so they are not mistaken for confirmed facts.
Condition is information, not a testing requirement
A long shutdown, obsolete controls, missing records or a past refrigerant conversion are facts to disclose, not reasons to test the unit.
A prior refrigerant conversion, controller replacement or major repair can change how the machine is identified. An original plate and later service label can both be useful; include the dates or records only if available.
We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.
Keep an occupied building operating
If the property remains occupied, tell the buyer which cooling services and access routes must remain available. A facility representative should establish the work boundaries before qualified personnel plan the actual disconnect and refrigerant recovery. We coordinate and pay for that work within the agreed purchase scope. The owner does not need to vent, drain or isolate the chiller to request a cash offer.
Measure the path from room to truck
Show the route through the mechanical room and note whether older piping, enclosures or other later additions now limit access.
The buyer covers agreed rigging, crane work if needed, loading, freight and hauling. Give the width and height of the narrowest opening, the distance to the loading point and any turns or changes of level. The chiller may have been installed before walls, cables or other equipment were added. A rigging crew verifies actual weight, lifting points and floor capacity; the owner should not try to move the machine for a quote.
Coordinate a sale with a larger project
A replacement or shutdown may have several contractors working against different milestones. Tell us when the equipment can be released, who approves access and whether shared systems need to stay operational. We make a cash offer and pay upfront before pickup when accepted. Put the asset list and agreed buyer-paid removal work in writing so the chiller purchase is not confused with the entire plant project.
If the chiller is being replaced, tell us when it will actually be released and which plant services must remain live. A replacement schedule and a completed isolation are different things.
What to send for a useful first conversation
For a restricted property, explain who authorizes access and whether the machine can be visited or photographed safely. Provide the available nameplate data and a view of the chiller and its surroundings. Note any access controls, active neighboring equipment and expected release conditions. The buyer needs these facts to plan removal, not a performance demonstration.
For a chiller labeled McQuay to sell in Ohio, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.
Does cooling tonnage equal equipment weight?
No. Cooling tons measure capacity, not the weight of the assembly. We consider all tonnages, including 20 to 2,000+ tons. A removal crew needs the actual dimensions and verified weight, not an estimate based on the capacity label.
