What to know about York chillers
A York chiller offer depends on the actual machine, included accessories and access. A label on a building control system is not necessarily the label for the chiller itself. Identify the equipment being offered and distinguish it from other York-branded components at the site.
A surplus machine may have become available because of a replacement, closure or consolidation. Tell us whether it is a complete chiller, what remains attached and who can authorize its sale. No assumption about its age or condition is necessary.
Plan the pickup at your Ohio site
Ohio pickup planning starts at the exact equipment location, not just the mailing address. Show the machine in its room or on its pad, the intended exit, the route to a truck and any locked gates. Tell us who can approve access and whether nearby equipment needs to stay in service. A roof, basement and outdoor yard each present different handling questions.
Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.
Reconcile original and later labels
Send the machine model, serial number, tonnage and refrigerant from its own label, and photograph any matching external starter if it is included.
An old equipment schedule, an original nameplate and a later service tag may not all describe the same configuration. Photograph the unit label and any retrofit or conversion markings without removing covers. Supply the model, serial, capacity, voltage and stated refrigerant. If the documents disagree, share the conflict instead of choosing the answer that sounds most likely; the buyer can follow up on the actual equipment.
Condition is information, not a testing requirement
Describe visible damage, missing components and the approximate last operating status if known. Unavailable history is acceptable and should be stated plainly.
A long idle period can leave the maintenance history incomplete. Give the last known status and distinguish what you observed from what an old record says. An unreadable label or an unknown fault is better described honestly than filled in with a guess.
We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.
Separate the chiller from live plant systems
The buyer coordinates and pays for the agreed disconnects and refrigerant recovery. Before the chiller is released, the facility representative should identify which water circuits, electrical feeds and controls serve other equipment. Qualified personnel plan isolation and recovery for the actual system. A machine that is not running can still contain refrigerant, fluid or stored electrical energy; do not cut, drain or vent it to obtain an offer.
Use drawings without treating them as a lift plan
Show the space between vessel ends, walls and other equipment, as well as the removal doorway, so the lifting approach is not based on an assumption.
Existing dimensions, rigging drawings or documented weights can help frame the job, especially for a large central-plant unit. Tell us whether they describe the installed configuration or an earlier one. The buyer covers agreed rigging, crane if needed, loading, freight and hauling. The crew still verifies current obstacles, floor capacity, actual weight and lifting points before moving the equipment.
Confirm ownership before release
An equipment owner, tenant and building owner may not be the same party. Identify who can authorize the sale and who can grant site access, including any financing or lease questions that need to be resolved. We offer cash and pay upfront before pickup after acceptance. The written scope should identify the chiller and the disconnect, recovery, rigging and freight work the buyer will cover.
If the chiller is being replaced, tell us when it will actually be released and which plant services must remain live. A replacement schedule and a completed isolation are different things.
What to send for a useful first conversation
When a building is closing, collect the unit identification and current photographs while safe access is available. Record the person authorized to sell, the person who can provide entry after closure, and any known removal constraints. Tell us whether records, controls or components are missing; there is no need to repair or test the machine before asking for an offer.
For a chiller labeled York to sell in Ohio, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.
Can a non-running machine be sold?
Yes. We consider non-running and unknown-condition equipment, and do not require a performance test. Describe known defects and missing parts so an offer can reflect the machine as it sits. Site access and safe removal still need to be evaluated.