What to know about McQuay chillers
For an older McQuay-labeled chiller, legible original tags and subsequent retrofit records are particularly useful. A maintenance document may use a different company name from the badge on the machine, so provide both when available without assuming the model or refrigerant has stayed unchanged.
A nameplate-led quote begins with a legible photo of the actual chiller, not a generic brochure. Add a wide shot, its exact location and any separate starter or drive. If the tag cannot be read, the model on an asset list and photographs may still provide a starting point.
Plan the pickup at your Ohio site
Ohio pickup planning starts at the exact equipment location, not just the mailing address. Show the machine in its room or on its pad, the intended exit, the route to a truck and any locked gates. Tell us who can approve access and whether nearby equipment needs to stay in service. A roof, basement and outdoor yard each present different handling questions.
Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.
Define the asset at its boundaries
Send close photos of original and updated labels, the complete unit and any replacement control or starter cabinet. Note the rated capacity as stated, if known.
A chiller purchase is clearer when the owner identifies the machine, any matching starter or drive, and the controls that go with it. Photograph the complete assembly as well as its manufacturer, model, serial, capacity, voltage and refrigerant label. Note which pumps, tower, pipes and building controls must stay. A brand name on nearby equipment is not a substitute for a unit-level identification.
Condition is information, not a testing requirement
A long shutdown, obsolete controls, missing records or a past refrigerant conversion are facts to disclose, not reasons to test the unit.
A prior refrigerant conversion, controller replacement or major repair can change how the machine is identified. An original plate and later service label can both be useful; include the dates or records only if available.
We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.
Separate the chiller from live plant systems
The buyer coordinates and pays for the agreed disconnects and refrigerant recovery. Before the chiller is released, the facility representative should identify which water circuits, electrical feeds and controls serve other equipment. Qualified personnel plan isolation and recovery for the actual system. A machine that is not running can still contain refrigerant, fluid or stored electrical energy; do not cut, drain or vent it to obtain an offer.
Use drawings without treating them as a lift plan
Show the route through the mechanical room and note whether older piping, enclosures or other later additions now limit access.
Existing dimensions, rigging drawings or documented weights can help frame the job, especially for a large central-plant unit. Tell us whether they describe the installed configuration or an earlier one. The buyer covers agreed rigging, crane if needed, loading, freight and hauling. The crew still verifies current obstacles, floor capacity, actual weight and lifting points before moving the equipment.
Confirm ownership before release
An equipment owner, tenant and building owner may not be the same party. Identify who can authorize the sale and who can grant site access, including any financing or lease questions that need to be resolved. We offer cash and pay upfront before pickup after acceptance. The written scope should identify the chiller and the disconnect, recovery, rigging and freight work the buyer will cover.
If a drive, starter or controller sits in another room, describe it separately and establish whether it is included. An offer is clearer when both the machine and its associated accessories are specifically listed.
What to send for a useful first conversation
When a building is closing, collect the unit identification and current photographs while safe access is available. Record the person authorized to sell, the person who can provide entry after closure, and any known removal constraints. Tell us whether records, controls or components are missing; there is no need to repair or test the machine before asking for an offer.
For a chiller labeled McQuay to sell in Ohio, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.
Does cooling tonnage equal equipment weight?
No. Cooling tons measure capacity, not the weight of the assembly. We consider all tonnages, including 20 to 2,000+ tons. A removal crew needs the actual dimensions and verified weight, not an estimate based on the capacity label.
