OHIO'S INDUSTRIAL CHILLER BUYER

Ohio chiller buyer

We Buy Screw Chillers in Ohio

If you have used screw chillers in Ohio, we can discuss buying the equipment as it sits. We consider chillers from 20 to 2,000+ tons, as well as all other tonnages and all refrigerants. There is no requirement to run or test the machine for an offer. We make cash offers, pay upfront before pickup, and coordinate local Ohio removal. The buyer covers the agreed disconnects, refrigerant recovery, crane and rigging as needed, loading, freight and hauling. The information below explains what to share and how to prepare for a practical purchase.

BUYING ONLY   /   SERVING ALL OF OHIO

Industrial chiller equipment
INDUSTRIAL EQUIPMENTOHIO   /   Screw Chillers
Payments Upfront
No Testing
We Cover All Freight
All Tonnages Bought
Built for the heavy lifting

WE BUY IT.
WE HANDLE THE REST.

When it is time to move an industrial chiller, you need a buyer who understands the whole job—not just the equipment.

Tell us about your chiller
01

Buyer, not a seller

We buy industrial chillers across Ohio, with payment upfront and no testing required.

02

Every size, every refrigerant

All tonnages and refrigerants are considered, including chillers from 20 to 2,000+ tons.

03

Removal, handled

We arrange crane work, rigging, refrigerant recovery, disconnects, loading, hauling and all freight.

Industrial chiller in an equipment room
Large equipment is our business

20–2,000+

TONS   /   AND ALL TONNAGES

From air-cooled and water-cooled units to centrifugal, screw and scroll chillers, tell us what you have. We buy equipment in all sizes and with all refrigerants.

Text Nameplate Photos
THE DETAILSOHIO   /   Screw Chillers

What to know about screw chillers

A screw chiller uses a rotary screw compressor. It may be a packaged outdoor unit or an indoor machine in a larger water system, and a single chiller can have more than one compressor or refrigerant circuit. The actual configuration matters more than the compressor name alone.

The compressor and condenser arrangement affect what the buyer needs to identify and how the equipment can be disconnected. Include the installed model, a wide view and details of any separately mounted starter or controls.

Plan the pickup at your Ohio site

Ohio pickup planning starts at the exact equipment location, not just the mailing address. Show the machine in its room or on its pad, the intended exit, the route to a truck and any locked gates. Tell us who can approve access and whether nearby equipment needs to stay in service. A roof, basement and outdoor yard each present different handling questions.

Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.

Work with an incomplete equipment record

Photograph the complete machine, chiller and compressor labels, and the control panel. Specify whether the tonnage is for the whole unit or a single circuit.

If the tag is difficult to read or the machine is no longer powered, a wide photo and an existing asset list can still start the conversation. Do not climb, remove electrical covers or enter an unsafe area to obtain a picture. Send whatever model, serial, capacity, voltage and refrigerant information is safely available, and clearly mark unknown fields so they are not mistaken for confirmed facts.

Condition is information, not a testing requirement

A known fault on one circuit, missing electrical parts or a prior repair should be described as accurately as possible; do not energize equipment for the quote.

If components were removed for another project, identify which ones are missing and photograph the remaining assembly. A machine with an incomplete control cabinet is different from a complete machine with an inoperable display, and both can be discussed without a test.

We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.

Account for a closed or long-idled site

A former operator may not be present to explain the chiller’s status. Share the most recent records available and identify the person who controls the property and can authorize access to utility areas. The buyer coordinates and pays for the agreed disconnects and required refrigerant recovery. Unknown status should be treated as unknown, not as proof that the machine is empty or safe to cut.

Measure the path from room to truck

Show the skid, connections and access around the compressor and vessels so the buyer can plan the disconnect and movement as a complete package or approved sections.

The buyer covers agreed rigging, crane work if needed, loading, freight and hauling. Give the width and height of the narrowest opening, the distance to the loading point and any turns or changes of level. The chiller may have been installed before walls, cables or other equipment were added. A rigging crew verifies actual weight, lifting points and floor capacity; the owner should not try to move the machine for a quote.

List a group of assets accurately

If you offer several chillers, identify each machine and whether the offer applies to the group or individual units. List separately located starters, drives or controls and state whether they are included. We make a cash offer and pay upfront before pickup after acceptance. The agreed purchase documents should describe what the buyer removes and the associated recovery, rigging and freight work.

Where records conflict, share both the installed equipment label and the inventory sheet. The buyer can resolve questions during review rather than assuming that a single old schedule describes the present machine.

What to send for a useful first conversation

For a restricted property, explain who authorizes access and whether the machine can be visited or photographed safely. Provide the available nameplate data and a view of the chiller and its surroundings. Note any access controls, active neighboring equipment and expected release conditions. The buyer needs these facts to plan removal, not a performance demonstration.

For used screw chillers in Ohio, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.

Does cooling tonnage equal equipment weight?

No. Cooling tons measure capacity, not the weight of the assembly. We consider all tonnages, including 20 to 2,000+ tons. A removal crew needs the actual dimensions and verified weight, not an estimate based on the capacity label.

A straightforward process

LET'S MAKE IT SIMPLE.

From your first photo to fast Ohio pickup, we make the heavy part our responsibility.

01 /

Share the details

Send the nameplate, location and any photos you have. A quick text works too.

02 /

Get a quote

We review your equipment and discuss an offer. No testing is required.

03 /

We handle removal

After the details are agreed, we arrange pickup, the equipment removal and freight.

Ready when you are

LET'S TALK CHILLERS.

Tell us what you have. We buy throughout Ohio, pay upfront and handle the heavy lifting.

Text Nameplate Photos
QUOTE REQUEST

Tell us about your equipment.

Fields marked * are required.

Images: up to 10 MB total. Have more photos? Text them to us instead.

Request a Quote