OHIO'S INDUSTRIAL CHILLER BUYER

Ohio chiller buyer

We Buy Chillers Marked R-513A in Ohio

If you have a chiller marked R-513A in Ohio, we can discuss buying the equipment as it sits. We consider chillers from 20 to 2,000+ tons, as well as all other tonnages and all refrigerants. There is no requirement to run or test the machine for an offer. We make cash offers, pay upfront before pickup, and coordinate local Ohio removal. The buyer covers the agreed disconnects, refrigerant recovery, crane and rigging as needed, loading, freight and hauling. The information below explains what to share and how to prepare for a practical purchase.

BUYING ONLY   /   SERVING ALL OF OHIO

Industrial chiller equipment
INDUSTRIAL EQUIPMENTOHIO   /   Refrigerants
Payments Upfront
No Testing
We Cover All Freight
All Tonnages Bought
Built for the heavy lifting

WE BUY IT.
WE HANDLE THE REST.

When it is time to move an industrial chiller, you need a buyer who understands the whole job—not just the equipment.

Tell us about your chiller
01

Buyer, not a seller

We buy industrial chillers across Ohio, with payment upfront and no testing required.

02

Every size, every refrigerant

All tonnages and refrigerants are considered, including chillers from 20 to 2,000+ tons.

03

Removal, handled

We arrange crane work, rigging, refrigerant recovery, disconnects, loading, hauling and all freight.

Industrial chiller in an equipment room
Large equipment is our business

20–2,000+

TONS   /   AND ALL TONNAGES

From air-cooled and water-cooled units to centrifugal, screw and scroll chillers, tell us what you have. We buy equipment in all sizes and with all refrigerants.

Text Nameplate Photos
THE DETAILSOHIO   /   Refrigerants

What to know about R-513A chillers

R-513A is a refrigerant blend used in some cooling equipment. An original R-513A label and a later conversion record are different pieces of information, so provide both when they exist.

We consider chillers using all refrigerants, including equipment labeled R-513A. A refrigerant label is only one part of the offer: the complete machine, its condition, included components and the pickup route also matter. Do not infer the current charge from a model name.

Plan the pickup at your Ohio site

Ohio pickup planning starts at the exact equipment location, not just the mailing address. Show the machine in its room or on its pad, the intended exit, the route to a truck and any locked gates. Tell us who can approve access and whether nearby equipment needs to stay in service. A roof, basement and outdoor yard each present different handling questions.

Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.

Separate cooling capacity from lifting weight

Report the complete designation and take photographs of the chiller plate, current charge label and major components.

Cooling tons describe refrigeration capacity, not the number of tons a machine weighs. The total capacity of a complete chiller also may differ from the rating of one compressor or module. Provide the model and serial, rated unit capacity, voltage and refrigerant from the chiller label. If a manufacturer drawing provides operating or shipping weight, share the document and identify which weight it states.

Condition is information, not a testing requirement

Disclose any known leak, prior recovery or conversion. The actual charge can be unknown; do not restart the chiller or open a fitting to find out.

If a prior operator’s records cannot be located, provide the information currently visible and say what is unknown. We can discuss an offer without a performance demonstration, although the equipment and access still need to be identified.

We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.

Identify the actual refrigerant safely

We consider all refrigerants and arrange qualified recovery when required as part of the agreed purchase. Photograph the original nameplate and any current conversion label, and pass along prior recovery records if available. A switched-off machine is not necessarily empty. Do not open a fitting or release refrigerant to check it. Appropriate personnel must assess the actual charge, circuit and applicable handling requirements.

Use drawings without treating them as a lift plan

If the machine was converted, disclose the documentation you have. The removal team can assess refrigerant handling without a performance test.

Existing dimensions, rigging drawings or documented weights can help frame the job, especially for a large central-plant unit. Tell us whether they describe the installed configuration or an earlier one. The buyer covers agreed rigging, crane if needed, loading, freight and hauling. The crew still verifies current obstacles, floor capacity, actual weight and lifting points before moving the equipment.

Document an as-is purchase

A clear as-is discussion distinguishes known faults from missing information. Provide photographs and describe removed components or an uncertain history; a running test is not required. We consider those facts alongside the removal requirements when making a cash offer. If accepted, payment is upfront before pickup. Confirm the machine, included accessories and buyer-paid scope rather than relying on an informal verbal description.

Where records conflict, share both the installed equipment label and the inventory sheet. The buyer can resolve questions during review rather than assuming that a single old schedule describes the present machine.

What to send for a useful first conversation

Send a wide picture of the entire chiller and a readable nameplate photo. Add the pickup address or city, the unit’s location in the building, and the name of the authorized equipment owner. Say whether controls or a separate starter are included and describe any known faults. A picture of the service exit helps the buyer understand how it may be removed.

For a chiller marked R-513A in Ohio, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.

What if another system must stay running?

Identify the live system and ask the facility representative to mark the boundary with the chiller being sold. The buyer plans the agreed disconnect and removal with qualified personnel. A site-specific review is different from testing the chiller for purchase.

A straightforward process

LET'S MAKE IT SIMPLE.

From your first photo to fast Ohio pickup, we make the heavy part our responsibility.

01 /

Share the details

Send the nameplate, location and any photos you have. A quick text works too.

02 /

Get a quote

We review your equipment and discuss an offer. No testing is required.

03 /

We handle removal

After the details are agreed, we arrange pickup, the equipment removal and freight.

Ready when you are

LET'S TALK CHILLERS.

Tell us what you have. We buy throughout Ohio, pay upfront and handle the heavy lifting.

Text Nameplate Photos
QUOTE REQUEST

Tell us about your equipment.

Fields marked * are required.

Images: up to 10 MB total. Have more photos? Text them to us instead.

Request a Quote