What to know about campus chillers
A campus closure or central-plant upgrade can make one or more chillers surplus even when other buildings still depend on the chilled-water network. The sale scope should distinguish the individual machine from shared pumps, distribution piping and controls.
A facility representative in Hamilton can start with the asset identifier, the machine’s location and the operational systems that must remain in place. If the property is being vacated, identify who will provide access and authorize release after normal operations end.
Plan the pickup at your Hamilton site
Hamilton is in Butler County. The city of Hamilton is in Butler County; it is not the same location as Hamilton County. Provide the complete address so dispatch and the removal team are directed to the correct site. Describe dock access, door dimensions and whether the chiller is in a shared plant before a route is chosen.
Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.
Work with an incomplete equipment record
Provide the plant or building identifier, unit serial number, rated tons and nameplate photo. List multiple machines separately rather than assuming they are identical.
If the tag is difficult to read or the machine is no longer powered, a wide photo and an existing asset list can still start the conversation. Do not climb, remove electrical covers or enter an unsafe area to obtain a picture. Send whatever model, serial, capacity, voltage and refrigerant information is safely available, and clearly mark unknown fields so they are not mistaken for confirmed facts.
Condition is information, not a testing requirement
Let us know which machines are decommissioned, which remain connected and which have an unknown history. We can consider equipment without a running test.
If a prior operator’s records cannot be located, provide the information currently visible and say what is unknown. We can discuss an offer without a performance demonstration, although the equipment and access still need to be identified.
We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.
Identify the actual refrigerant safely
We consider all refrigerants and arrange qualified recovery when required as part of the agreed purchase. Photograph the original nameplate and any current conversion label, and pass along prior recovery records if available. A switched-off machine is not necessarily empty. Do not open a fitting or release refrigerant to check it. Appropriate personnel must assess the actual charge, circuit and applicable handling requirements.
Use drawings without treating them as a lift plan
Coordinate with the person responsible for the central plant, campus access and isolation schedule; confirm the exit route through occupied or locked spaces.
Existing dimensions, rigging drawings or documented weights can help frame the job, especially for a large central-plant unit. Tell us whether they describe the installed configuration or an earlier one. The buyer covers agreed rigging, crane if needed, loading, freight and hauling. The crew still verifies current obstacles, floor capacity, actual weight and lifting points before moving the equipment.
List a group of assets accurately
If you offer several chillers, identify each machine and whether the offer applies to the group or individual units. List separately located starters, drives or controls and state whether they are included. We make a cash offer and pay upfront before pickup after acceptance. The agreed purchase documents should describe what the buyer removes and the associated recovery, rigging and freight work.
If the chiller is being replaced, tell us when it will actually be released and which plant services must remain live. A replacement schedule and a completed isolation are different things.
What to send for a useful first conversation
Start with an asset list: manufacturer, model, serial, rated capacity, refrigerant and the location of each machine. Identify which units are surplus and whether they are still connected. Add photographs showing the room, pad or roof and the route toward a loading area. If the records are incomplete, mark unknown items rather than guessing or starting the machine.
For surplus campus chillers in Hamilton, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.
Does cooling tonnage equal equipment weight?
No. Cooling tons measure capacity, not the weight of the assembly. We consider all tonnages, including 20 to 2,000+ tons. A removal crew needs the actual dimensions and verified weight, not an estimate based on the capacity label.