What to know about McQuay chillers
For an older McQuay-labeled chiller, legible original tags and subsequent retrofit records are particularly useful. A maintenance document may use a different company name from the badge on the machine, so provide both when available without assuming the model or refrigerant has stayed unchanged.
A chiller labeled McQuay in Columbus may be surplus after a plant upgrade, building closure or cooling-system replacement. Identify the exact machine rather than the entire plant, and specify whether the starter or drive is part of the proposed purchase.
Plan the pickup at your Columbus site
Columbus is in Franklin County. A Columbus pickup may involve an occupied commercial building, a secured data site, or a plant outside the central business area. Give the pickup address and loading entrance rather than just the city. If the machine shares a mechanical room with active equipment, mark the boundary of the unit to be removed and tell us which access doors can be opened.
Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.
Work with an incomplete equipment record
Send close photos of original and updated labels, the complete unit and any replacement control or starter cabinet. Note the rated capacity as stated, if known.
If the tag is difficult to read or the machine is no longer powered, a wide photo and an existing asset list can still start the conversation. Do not climb, remove electrical covers or enter an unsafe area to obtain a picture. Send whatever model, serial, capacity, voltage and refrigerant information is safely available, and clearly mark unknown fields so they are not mistaken for confirmed facts.
Condition is information, not a testing requirement
A long shutdown, obsolete controls, missing records or a past refrigerant conversion are facts to disclose, not reasons to test the unit.
A machine described as spare may be disconnected, or it may still be connected and held for backup. Clarify its current release status and when the site can make it available; do not start it just to establish its value.
We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.
Keep an occupied building operating
If the property remains occupied, tell the buyer which cooling services and access routes must remain available. A facility representative should establish the work boundaries before qualified personnel plan the actual disconnect and refrigerant recovery. We coordinate and pay for that work within the agreed purchase scope. The owner does not need to vent, drain or isolate the chiller to request a cash offer.
Plan for basement or interior equipment
Show the route through the mechanical room and note whether older piping, enclosures or other later additions now limit access.
An interior machine may have to pass through a service corridor, opening, ramp or other constrained route. Photograph each transition and describe any surfaces or adjacent machinery that need protection. The buyer coordinates and pays for agreed rigging, crane work if needed, loading and freight. Qualified personnel determine whether a route is viable and whether any separation is appropriate for that specific machine.
List a group of assets accurately
If you offer several chillers, identify each machine and whether the offer applies to the group or individual units. List separately located starters, drives or controls and state whether they are included. We make a cash offer and pay upfront before pickup after acceptance. The agreed purchase documents should describe what the buyer removes and the associated recovery, rigging and freight work.
If the building owner and equipment owner are different, confirm who can approve the sale and who controls the building. The machine cannot be released merely because a contractor or tenant knows it is unused.
What to send for a useful first conversation
When a building is closing, collect the unit identification and current photographs while safe access is available. Record the person authorized to sell, the person who can provide entry after closure, and any known removal constraints. Tell us whether records, controls or components are missing; there is no need to repair or test the machine before asking for an offer.
For a chiller labeled McQuay in Columbus, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.
Does cooling tonnage equal equipment weight?
No. Cooling tons measure capacity, not the weight of the assembly. We consider all tonnages, including 20 to 2,000+ tons. A removal crew needs the actual dimensions and verified weight, not an estimate based on the capacity label.
